REPORT ON A MEETING OF RANSKILL PARISH COUNCIL WITH VIA EAST MIDLANDS, MAIN CONTRACTOR TO NOTTINGHAMSHIRE COUNTY COUNCIL HIGHWAYS
October 2026
Present:-
County Councillor
VIA EM: Assistant District Manager
VIA EM: Signals Design Manager
Parish Councillors: 3
Three issues were discussed:-
- Traffic Lights Sequence
VIA were able to witness problems with vehicles being stranded in the middle of the crossroads as the lights changed. Several vehicles were observed going through the lights on red. HGVs and farm vehicles were seen turning at the lights slowly, holding up other traffic and causing issues as the lights changed again, leaving traffic stalled as the lights changed.
VIA informed the PC that the lights were timed in accordance with national standards but realised that in our case this needed changing. This mainly due to lack of visibility as the pub and shop buildings were close to the road. VIA seemed to accept that a better option would be a four way light sequence, even though traffic would have to wait longer in a holding pattern, but would be safer. It would also increase compliance with lights on red.
Councillors felt that this could be the preferred option, rather than simply increasing the time sequences to give a longer period on green.
Our C. Cllr will progress on a regular basis to ensure the project gains funding.
- Parking at the top of Station Road
VIA observed the issue and obstructions caused by illegal parking. The officer needs better evidence to progress and asked for evidence gathering. The Clerk will arrange for photographic evidence, which will be submitted in the coming weeks.
- Blyth Road
VIA visited the site of the sharp bend on Blyth Road and met the residents of Thorn Cottage. The warning signs placed at each end of Blyth Road, unsuitable for HGVs, seems to have reduced the volume of heavy trucks. Nevertheless, there is still a significant volume of heavy vehicles, including farm traffic which cause many near misses on this narrow country road. The officer has now seen the issue and will report to their traffic planners to try to find a more intelligent solution.
As a follow up to our meeting the Signals Design Manager has issued the following note: –
I have now run through the performance modelling of the traffic signals to test the effects of changing the method of operation at the junction to separate out some, or all, of the traffic movements to try and address the issues you have here.
As we discussed, separating out the traffic movements adds extra stages and lost time into the junction operation which will affect queues and delays at the junction. The signal cycle time will increase to accommodate the additional stages increasing waiting times, and the version with all four approaches running separately will add the greatest amount of delay. By way of example, the average vehicle delay time and queue lengths on the Great North Road north approach in the AM peak are predicted to increase as follows: –
| Option | Average delay per vehicle | Mean queue length |
| Existing arrangement | 24 seconds | 4 vehicles |
| Station Rd/Blyth Rd separate | 34 seconds | 6 vehicles |
| All arms separate | 91 seconds | 11 vehicles |
The benefits of any scheme to alter the staging at the junction will have to be balanced against the cost of additional delays resulting from these changes
In the meantime, I have asked for the clearance periods between the end of each traffic stage to be increased by 2 seconds from the current 8 seconds to 10 to provide a bit more leeway when large vehicles are slow to turn around the tight corners at the crossroads.
Result
The PC has addressed 3 significant issues in the village with this meeting.
The main change in the traffic light sequence to increase safety and reduce collisions will be actioned next year when NCC budgets allow. The PC has to determine the level of acceptable delay. In the meantime, the sequence will be delayed by 2 seconds to increase time each way as soon as possible.
The PC will submit photographic evidence of bad car parking.
The NCC traffic planners will try to find an improved layout to improve safety.
Our C. Cllr will continue to champion our request to ensure progression.
If any resident feels that they have a contribution to make, in the first instance please contact the clerk: –
clerk@ranskillparishcouncil.gov.uk
Alternatively, feel free to attend any Parish Council meeting, the timetable is on our website: –
www.ranskillparishcouncil.gov.uk
Ranskill Parish Council
October 2026
**Update**
Tthe clearance periods at the end of the green signals on both the Gt North Road stage and also the Blyth Rd/ Station Rd stage have been increased from the previous value of 8 seconds to 10 seconds. The change was made on Friday 23rd October. This should give an extra bit of breathing space for those vehicles waiting to turn right from the centre of the junction and delayed by slow moving vehicles turning around the 2 tight corners from Station Road and Blyth Road.